Running Tracks
03 / SERVICEOur services

Running Tracks

Polyurethane spray-coat and sandwich systems line-marked to World Athletics standards.

01The service in detail

Consistent surfaces for every stride

Running tracks rely on balanced surface resilience, base stability, accurate marking and drainage. Competition, training and community use call for different system choices, with careful attention to curves and transitions into adjacent areas.

Across the UAE, exposure, drainage, operating hours and access constraints can differ substantially between sites. We review these conditions alongside the intended users and lifecycle needs, so the specification is appropriate to the location rather than a copied material list.

Scope of work

  • Spray-coat and sandwich systems
  • Heat-resistant polyurethane
  • World Athletics-standard line marking
  • Spike-resistant surfaces
02Systems & options

The right solution, not one solution for everyone

01

Spray-coat system

A rubber base with a sprayed finish can suit training use, depending on project requirements and selected materials.

02

Sandwich system

A layered construction combines a resilient base and uniform top finish, selected against performance requirements.

03

Walking & jogging routes

Routes for parks and developments with planned crossings, gradients and connections to walkways.

03Design considerations

Engineering details that make the difference

01

Base readiness

Check base evenness, moisture and joint condition before surfacing.

02

Resilience & performance

Choose layer thickness and composition to the specified system and use; thickness alone does not define performance.

03

Marking & drainage

Accurate lane geometry coordinated with drainage and track edges.

04Project stages

From site assessment to handover and operation

  1. 01

    Assess the site and brief

    Review dimensions, access, ground conditions and services, then discuss intended use and operational priorities to define a realistic scope.

  2. 02

    Design and select the system

    Coordinate layout, levels, surfaces, equipment, lighting and drainage. Explain technical options before approving materials and quantities.

  3. 03

    Prepare the site and base

    Protect existing areas and organise access, then undertake base preparation, civil works and drainage to the approved drawings.

  4. 04

    Install systems and equipment

    Follow the specified application sequence and manufacturer guidance, checking site conditions and interfaces between surfaces, equipment and services.

  5. 05

    Inspect and close observations

    Review surfaces, junctions, fixings, markings and equipment operation. Record and resolve observations before acceptance.

  6. 06

    Handover and plan care

    Provide agreed documentation and operating, cleaning and maintenance guidance. Clarify use limits, warranty terms and follow-up arrangements in the contract.

05Quality & acceptance

What do we review before handover?

Material conformity

Review system and material data against approved project specifications and check storage conditions before application.

Installation consistency

Monitor base readiness, layer uniformity, seams and edges. Resolve defects before covering them with subsequent layers.

User safety

Inspect fixings, edges, transitions and safety zones, and check equipment within its specified operating limits.

Clear documentation

Provide agreed care instructions, technical information and warranties. Independent certificates or testing are included when specified in the scope.

06Care & longevity

Protect your facility’s value after installation

Clean gently, remove debris and inspect cracks and edges without unapproved chemicals.

Care frequency depends on use intensity, exposure and manufacturer instructions. Keep a record of inspections and repairs, use compatible cleaning methods and restrict access to damaged areas until assessed. Corrective work should address the cause, not only the visible defect.

Maintenance & renovation
07Planning & budget

What determines the scope and cost?

Area and site condition

Cost is not determined by surface area alone. Removal, grading, base strengthening and site access can change the construction scope.

System and equipment level

Materials and quantities depend on surfacing, equipment, fencing, lighting, drainage and specified performance requirements.

Operations and testing

Phased work at a live venue, independent testing and additional documentation requirements affect the programme and scope.

Information for a clear proposal

  • Project location, area and dimensions
  • Intended use and expected user numbers
  • Site photographs or available drawings
  • Condition of the base and existing services
  • Target completion and operating requirements
08Surface & installation details

From playing surfaces to the surrounding details

Running Tracks — 1
Running Tracks — 2
Running Tracks — 3

Project archive images illustrate related surfaces and equipment; individual photos do not represent every available system.

09Frequently asked questions

Answers before you start your project

Can an old track be renewed without full removal?

Potentially, after assessing layer adhesion, the base and drainage. Inspection determines whether a new top layer is sufficient or deeper repairs are needed.

How is a quotation prepared?

Start with location, intended use, photographs or drawings, then determine whether a site visit is needed. The proposal sets out works, materials, quantities, exclusions and a proposed programme for a clear comparison.

How long does installation take?

Duration is determined after reviewing the site, system and quantities. Civil works, procurement, application conditions and curing periods affect the schedule. The proposal sets out a programme rather than a fixed duration for every project.

Does the service include design and equipment?

Design, civil works, surfacing, equipment and lighting can be coordinated within one project. Included and excluded items are explicitly defined in the proposal and contract.

Does every system certify the completed facility?

Material or system certification does not automatically certify the installed facility. If formal approval is required, the standard, tests and assessment body are defined in the agreed scope.

What warranty and aftercare are available?

Terms depend on materials, system type and use conditions. Warranty duration, coverage, exclusions and care obligations are documented in the contract; a suitable maintenance programme can also be agreed.

Can work take place without closing the entire venue?

Phased or zoned work is assessed where safety, access and application requirements allow it. Closure periods and protected areas are agreed before work starts.